Build a correctable record of a buyer problem and the evidence needed to assess a proposed change.
Your reusable working template 1/2
1. Ask for a recent example and mark every item confirmed, estimated or unknown.
2. Do not convert lost time to cash savings without checking the mechanism with the buyer.
3. Use the example to practice arithmetic, then replace every input with your opportunity evidence.
4. Send a concise summary for explicit correction and agree the next evidence step.
A practical Tibyan working aid, not a validated assessment. Example is hypothetical; adapt decisions and figures to your context. Do not enter sensitive information in a shared copy.
TIBYAN STRATEGY | تبيان استراتيجي · 18
Discovery Guide and Value Hypothesis
Build a correctable record of a buyer problem and the evidence needed to assess a proposed change.
Your reusable working template 2/2
A practical Tibyan working aid, not a validated assessment. Example is hypothetical; adapt decisions and figures to your context. Do not enter sensitive information in a shared copy.
TIBYAN STRATEGY | تبيان استراتيجي · 18
Discovery Guide and Value Hypothesis
Build a correctable record of a buyer problem and the evidence needed to assess a proposed change.
Completed hypothetical example 1/2
Maintenance manager describes unplanned stoppage on one manufacturing line.
Reported ten hours/month; operations must confirm the baseline and period representativeness.
Estimated contribution exposure:10x2000=20000 units/month; check whether output can be recovered and demand exists.
Investigate avoidable stoppage without interrupting safe operations or assuming every event is preventable.
A practical Tibyan working aid, not a validated assessment. Example is hypothetical; adapt decisions and figures to your context. Do not enter sensitive information in a shared copy.
TIBYAN STRATEGY | تبيان استراتيجي · 18
Discovery Guide and Value Hypothesis
Build a correctable record of a buyer problem and the evidence needed to assess a proposed change.
Completed hypothetical example 2/2
Pilot hypothesis:two avoidable hours/month gives4000 units/month before costs; causal mechanism and avoidable events unverified.
First-year external cost30000; twelve full months at4000 gives48000, leaving18000 before internal effort. Delayed benefit changes this; compare process improvement and no change.
Operations validates events and capacity; finance checks contribution and full costs; IT checks feasible data access.
Buyer to arrange a baseline review with operations and finance; seller sends input list first. Set a date together; no agreed date is invented.
A practical Tibyan working aid, not a validated assessment. Example is hypothetical; adapt decisions and figures to your context. Do not enter sensitive information in a shared copy.